Maintenance Report

Search Filter:

Showing 6,411-6,420 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
641124 Nov 2023Scheduled Maintenance1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes.
Furnace IIWATER MAINEFOLD
641224 Nov 2023Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 2
641324 Nov 2023Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 3
641424 Nov 2023Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 1
641524 Nov 2023Scheduled MaintenanceF1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 1
641624 Nov 2023Scheduled MaintenanceF1- ELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 2
641724 Nov 2023Scheduled MaintenanceF1- ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 3
641824 Nov 2023Scheduled MaintenanceFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.

Furnace IHYDRAULIC POWER PACK NO. 1
641924 Nov 2023Scheduled MaintenanceFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IHYDRAULIC POWER PACK NO. 2
642023 Nov 2023Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 1