| 471 | 20 Mar 2026 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 472 | 20 Mar 2026 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 473 | 20 Mar 2026 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 474 | 20 Mar 2026 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 1 | |
| 475 | 20 Mar 2026 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |
| 476 | 20 Mar 2026 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |
| 477 | 20 Mar 2026 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 478 | 20 Mar 2026 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 479 | 20 Mar 2026 | Scheduled Maintenance | 1.check transformer temp. and oil level.
2. check transformer oil leakage.
3. check crystal color. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |
| 480 | 20 Mar 2026 | Scheduled Maintenance | 1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |