| 3751 | 07 Dec 2024 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also. | Other | WASHING PLANT | |
| 3752 | 06 Dec 2024 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 1 | |
| 3753 | 06 Dec 2024 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 2 | |
| 3754 | 06 Dec 2024 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 3755 | 06 Dec 2024 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 3756 | 06 Dec 2024 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 3757 | 06 Dec 2024 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 1 | |
| 3758 | 06 Dec 2024 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |
| 3759 | 06 Dec 2024 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |
| 3760 | 06 Dec 2024 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |