Shutdowns
Showing 7,221-7,228 of 7,425 items.
| # | Furnace | Date | From | To | Duration | Remarks | |
|---|---|---|---|---|---|---|---|
| 7221 | Furnace II | 07 May 2021 | 01:40:00 am | 01:45:00 am | 0h 5min | Incomer high voltage trip | |
| 7222 | Furnace I | 06 May 2021 | 01:30:00 am | 01:40:00 am | 0h 10min | Zesco power failure | |
| 7223 | Furnace I | 05 May 2021 | 11:00:00 pm | 11:30:00 pm | 1h 30min | Due to electrode length checking and electrode no1 slipping time automatically coming down then spring tightening | |
| 7224 | Furnace I | 04 May 2021 | 09:25:00 pm | 09:45:00 pm | 0h 20min | Electrode no3 C1 out let water no coming. | |
| 7225 | Furnace I | 02 May 2021 | 01:45:00 am | 01:55:00 am | 0h 10min | Due to Ele no 1 A6 clamp water leakage with sparking. | |
| 7226 | Furnace II | 01 May 2021 | 09:45:00 pm | 09:55:00 pm | 0h 10min | Due to Ele no 3 sparking so tightening the bolts | |
| 7227 | Furnace I | 01 May 2021 | 04:35:00 pm | 04:45:00 pm | 0h 10min | Due to electrode no3 slipping problem | |
| 7228 | Furnace II | 29 Apr 2021 | 03:40:00 am | 11:05:00 am | 7h 25min | Electrode no 1 all clamp insulation change |