Shutdowns

Showing 7,001-7,008 of 7,425 items.
#FurnaceDateFromToDurationRemarks 
     
7001Furnace II14 Jun 202109:35:00 am09:45:00 am0h 10minElectrode no.1 C1 clamp sparking
7002Furnace II14 Jun 202109:35:00 am09:45:00 am0h 10minE3 sparking and bolt tight.
7003Furnace II13 Jun 202112:00:00 am12:10:00 am0h 10minElectrode length checking
7004Furnace I11 Jun 202104:00:00 pm04:10:00 pm0h 10minDue to E2 sparking problem and bolt tightening
7005Furnace II10 Jun 202106:05:00 pm06:35:00 pm1h 30minEle 3 again sparking problem putting paste in clamps.
7006Furnace II10 Jun 202105:55:00 am03:55:00 pm10h 0minEle no3 C2&C6 clamp changing
7007Furnace II10 Jun 202112:00:00 am02:15:00 am2h 15minB3 clamp lifting and tie rod bolt changed and C6 clamp water outlet no coming it was repair
7008Furnace II09 Jun 202109:05:00 pm09:20:00 pm0h 15minElectrode length checking.