Shutdowns

Showing 6,521-6,528 of 7,425 items.
#FurnaceDateFromToDurationRemarks 
     
6521Furnace II24 Oct 202110:25:00 am11:05:00 am1h 20minElectrode no.3 broken.
6522Furnace II23 Oct 202112:10:00 pm02:50:00 pm3h 20minEle no3 sparking and water leakage
6523Furnace I23 Oct 202109:05:00 pm09:15:00 pm0h 10minDue to Electrodes length checking
6524Furnace I21 Oct 202109:05:00 am10:25:00 am1h 20minElectrode no.2 sparking problem.we are putting paste inside the all clamps.
6525Furnace I21 Oct 202109:05:00 am10:25:00 am1h 20minDue to Electrode 2 sparking,water leakage,bolt tighting and paste putting.
6526Furnace I20 Oct 202112:40:00 am01:35:00 am1h 5minDue to electrode no1 Ap2 pressuring pipe broken
6527Furnace II18 Oct 202109:20:00 pm09:55:00 pm1h 25minZesco power failure
6528Furnace I18 Oct 202109:20:00 pm09:55:00 pm1h 25minZesco power failure