Maintenance Report

Search Filter:

Showing 2,771-2,780 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
277126 Apr 2025Scheduled MaintenanceWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also.
OtherWASHING PLANT
277225 Apr 2025Scheduled MaintenanceF1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 1
277325 Apr 2025Scheduled MaintenanceF1- ELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 2
277425 Apr 2025Scheduled MaintenanceF1- ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 3
277525 Apr 2025Scheduled MaintenanceFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.

Furnace IHYDRAULIC POWER PACK NO. 1
277625 Apr 2025Scheduled MaintenanceFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IHYDRAULIC POWER PACK NO. 2
277725 Apr 2025Scheduled Maintenance ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 1
277825 Apr 2025Scheduled MaintenanceELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 2
277925 Apr 2025Scheduled Maintenance ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 3
278025 Apr 2025Scheduled MaintenanceFURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IIHYDRAULIC POWER PACK NO. 1