| 2431 | 13 Jun 2025 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 2432 | 13 Jun 2025 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 2433 | 13 Jun 2025 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 2434 | 13 Jun 2025 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 1 | |
| 2435 | 13 Jun 2025 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |
| 2436 | 13 Jun 2025 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |
| 2437 | 13 Jun 2025 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 2438 | 13 Jun 2025 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 2439 | 13 Jun 2025 | Scheduled Maintenance | 1.check transformer temp. and oil level.
2. check transformer oil leakage.
3. check crystal color. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |
| 2440 | 13 Jun 2025 | Scheduled Maintenance | 1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |