| 191 | 01 May 2026 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 192 | 01 May 2026 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace I | WATER MAINEFOLD | |
| 193 | 01 May 2026 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace II | WATER MAINEFOLD | |
| 194 | 01 May 2026 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 2 | |
| 195 | 01 May 2026 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 3 | |
| 196 | 01 May 2026 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 1 | |
| 197 | 30 Apr 2026 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 1 | |
| 198 | 30 Apr 2026 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 2 | |
| 199 | 30 Apr 2026 | Scheduled Maintenance | TELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.
| Other | TELPHER (FURNACE 1) | |
| 200 | 30 Apr 2026 | Scheduled Maintenance | TELPHER FOR F2
1. checking the bearing, rollers condition and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.
| Other | TELPHER ( FURNACE 2) | |