#DateTypeDetailsFurnaceEquipmentActions
13108 May 2026Scheduled Maintenance ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 1
13208 May 2026Scheduled MaintenanceELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 2
13308 May 2026Scheduled Maintenance ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 3
13408 May 2026Scheduled MaintenanceFURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IIHYDRAULIC POWER PACK NO. 1
13508 May 2026Scheduled MaintenanceFURNACE 2

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IIHYDRAULIC POWER PACK NO. 2
13608 May 2026Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil leakage.
3. check crystal color.
Furnace IIFURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR)
13708 May 2026Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors.
Furnace IIFURNACE 2 TRANSFORMER NO. 2
13808 May 2026Scheduled Maintenance1.check transformer temp. and oil level.
2. check transformer oil lekage.
3.check crystal colors.
Furnace IFURNACE 1 TRANSFORMER
13908 May 2026Scheduled Maintenance1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD.
Furnace ICHARGING CHUTES
14008 May 2026Scheduled Maintenance1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD.
Furnace IICHARGING CHUTES