Maintenance Report

Search Filter:

Showing 1,171-1,180 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
117112 Dec 2025Scheduled Maintenance1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage.
Furnace IIHYDRAULIC POWER PACK NO. 2
117212 Dec 2025Scheduled Maintenance1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes.
Furnace IWATER MAINEFOLD
117312 Dec 2025Scheduled Maintenance1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes.
Furnace IIWATER MAINEFOLD
117412 Dec 2025Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 2
117512 Dec 2025Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 3
117612 Dec 2025Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 1
117711 Dec 2025Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 1
117811 Dec 2025Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 2

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 2
117911 Dec 2025Scheduled MaintenanceTELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.

OtherTELPHER (FURNACE 1)
118011 Dec 2025Scheduled MaintenanceTELPHER FOR F2

1. checking the bearing, rollers condition and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.

OtherTELPHER ( FURNACE 2)