Supply Date24 Sep 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity30.34
Freight0
Loading Charges34.41463415
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3349.98
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.60
Fe4.29
SiO215.15
Al2O34.41
P0.145
Size 0-10MM2.90
Size 10-20MM3.60
Size 20-100MM93.50
Size +100MM0
MOISTURE3.15