Supply Date24 Sep 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity28.78
Freight460
Loading Charges-182.1712474
Offloading Charges15.58
Royalty65.16
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost2689.04
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn34.66
Fe1.10
SiO224.10
Al2O34.99
P0.125
Size 0-10MM2.60
Size 10-20MM25.0
Size 20-100MM57.90
Size +100MM14.50
MOISTURE0.66