Raw Material Inward
| Supply Date | 23 Sep 2022 |
|---|---|
| Contract Number | SAFAL/P/STEAM COAL/08.07/2022 |
| Item | Steam Coal |
| Supplier Name | Maamba Energy Limited |
| Grade (%) | N/A |
| Lot Number | Coal Maamba Collieries-Lot No-2(Peas) |
| Deviance | 0 |
| Inward Quantity | 29.86 |
| Freight | 59.19 |
| Loading Charges | 0 |
| Offloading Charges | -1.949430676 |
| Royalty | 0 |
| Other Cost | 1 |
| Quality Deviance | (not set) |
| Grade Deviance | (not set) |
| Total Cost | 4310.01 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |