Supply Date23 Sep 2022
Contract NumberSAFAL/P/MN ORE/08.02/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity53.46
Freight28.72
Loading Charges1.0302
Offloading Charges0
Royalty7.68
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost8736.98
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.95
Fe3.10
SiO211.60
Al2O33.40
P0.125
Size 0-10MM3.10
Size 10-20MM1.50
Size 20-100MM24.80
Size +100MM70.60
MOISTURE0.91