Supply Date20 Sep 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity19.08
Freight0
Loading Charges0.044025157
Offloading Charges0
Royalty6.12
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1567.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.65
Fe5.05
SiO29.95
Al2O34.55
P0.154
Size 0-10MM7.65
Size 10-20MM11.24
Size 20-100MM79.01
Size +100MM2.10
MOISTURE6.24