Supply Date19 Sep 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity32.38
Freight0
Loading Charges37.63310686
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3679.44
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.50
Fe4.12
SiO210.62
Al2O34.40
P0.155
Size 0-10MM5.65
Size 10-20MM10.55
Size 20-100MM73.70
Size +100MM10.10
MOISTURE4.25