Supply Date19 Sep 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity34.42
Freight460
Loading Charges219.07
Offloading Charges15.58
Royalty96.62
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost4143.95
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.20
Fe2.38
SiO215.40
Al2O33.85
P0.123
Size 0-10MM2.08
Size 10-20MM3.25
Size 20-100MM77.37
Size +100MM17.30
MOISTURE0.95