Raw Material Inward
| Supply Date | 19 Sep 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/08.01/2022 |
| Item | Manganese Ore |
| Supplier Name | METCHEM RESOURCES ZAMBIA LTD |
| Grade (%) | High (44% - 50%) |
| Lot Number | METCHEM -HIGH GRADE MN ORE |
| Deviance | 0 |
| Inward Quantity | 46.56 |
| Freight | 58.14 |
| Loading Charges | 0.656 |
| Offloading Charges | 0 |
| Royalty | 9.12 |
| Other Cost | 1 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 8795.93 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |