Supply Date17 Sep 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity26.82
Freight0
Loading Charges31.51304996
Offloading Charges0
Royalty6.12
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3047.64
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.45
Fe2.88
SiO29.74
Al2O34.55
P0.154
Size 0-10MM8.45
Size 10-20MM9.24
Size 20-100MM80.76
Size +100MM1.55
MOISTURE5.95