Raw Material Inward
| Supply Date | 15 Sep 2022 |
|---|---|
| Contract Number | SAFAL/MN ORE/ 06.01/2022 |
| Item | Manganese Ore |
| Supplier Name | JUDITH BWALYA KABENDE |
| Grade (%) | High (44% - 50%) |
| Lot Number | Judith Bwalya - Mn Ore |
| Deviance | 0 |
| Inward Quantity | 32.94 |
| Freight | 350 |
| Loading Charges | -650 |
| Offloading Charges | 0 |
| Royalty | 88.44 |
| Other Cost | 16.05 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3087.72 |
| Conversion Rate (Please insert 1 if no conversion is required) | 16.05 |
| Inward Status | Accepted |