Supply Date15 Sep 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity24.42
Freight0
Loading Charges0
Offloading Charges37.63308763
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2774.92
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.90
Fe3.26
SiO29.85
Al2O33.94
P0.154
Size 0-10MM8.10
Size 10-20MM4.25
Size 20-100MM78.95
Size +100MM8.70
MOISTURE7.24