Raw Material Inward
| Supply Date | 15 Sep 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/09.02/2022 |
| Item | Manganese Ore |
| Supplier Name | METCHEM RESOURCES ZAMBIA LTD |
| Grade (%) | High (44% - 50%) |
| Lot Number | METCHEM -HIGH GRADE MN ORE |
| Deviance | 0 |
| Inward Quantity | 39 |
| Freight | 42.37 |
| Loading Charges | 0.656 |
| Offloading Charges | -9.315897436 |
| Royalty | 8.77 |
| Other Cost | 1 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 6570.72 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |