Supply Date13 Sep 2022
Contract NumberSAFAL/P/MN ORE/08.02/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity41.62
Freight28.72
Loading Charges1.0302
Offloading Charges0
Royalty7.68
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6801.96
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.10
Fe3.10
SiO214.92
Al2O32.66
P0.122
Size 0-10MM1.12
Size 10-20MM3.10
Size 20-100MM16.60
Size +100MM79.10
MOISTURE0.59