Supply Date13 Sep 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity29.02
Freight0
Loading Charges0
Offloading Charges34.4145417
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3204.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.90
Fe3.50
SiO213.10
Al2O33.60
P0.155
Size 0-10MM8.60
Size 10-20MM11.70
Size 20-100MM68.96
Size +100MM10.74
MOISTURE7.85