Supply Date13 Sep 2022
Contract NumberSAFAL/P/MN ORE/08.02/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity44.66
Freight28.72
Loading Charges1.0302
Offloading Charges0
Royalty7.68
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7298.79
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.78
Fe2.45
SiO215.98
Al2O32.74
P0.125
Size 0-10MM1.02
Size 10-20MM1.15
Size 20-100MM7.20
Size +100MM90.63
MOISTURE0.68