Supply Date12 Sep 2022
Contract NumberSAFAL/P/MN ORE/08.02/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity44.32
Freight28.04
Loading Charges1.0302
Offloading Charges0.68
Royalty7.68
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7243.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.10
Fe3.58
SiO212.90
Al2O33.50
P0.122
Size 0-10MM1.15
Size 10-20MM2.25
Size 20-100MM10.15
Size +100MM86.45
MOISTURE0.50