Supply Date10 Sep 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity39.68
Freight460
Loading Charges219.07
Offloading Charges15.58
Royalty98.23
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost4781.21
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.54
Fe2.10
SiO214.78
Al2O34.20
P0.132
Size 0-10MM0.75
Size 10-20MM4.10
Size 20-100MM82.85
Size +100MM12.30
MOISTURE1.35