Supply Date10 Sep 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity36.82
Freight460
Loading Charges219.07
Offloading Charges15.58
Royalty108.34
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost4459.79
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn44.70
Fe2.35
SiO28.25
Al2O35.70
P0.129
Size 0-10MM-10mm=100%
Size 10-20MM
Size 20-100MM
Size +100MM
MOISTURE5.70