Supply Date09 Sep 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity46.62
Freight450
Loading Charges0
Offloading Charges126
Royalty125.35
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost7312.22
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.07
Fe2.95
SiO28.90
Al2O34.55
P0.162
Size 0-10MM2.10
Size 10-20MM4.65
Size 20-100MM64.05
Size +100MM29.20
MOISTURE0.98