Supply Date08 Sep 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity31.62
Freight41.15
Loading Charges1.758
Offloading Charges0
Royalty6.06
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4900.09
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.34
Fe5.69
SiO213.10
Al2O36.03
P0.130
Size 0-10MM3.70
Size 10-20MM2.55
Size 20-100MM80.65
Size +100MM13.10
MOISTURE1.68