Supply Date08 Sep 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity43.08
Freight450
Loading Charges126
Offloading Charges0
Royalty125.05
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost6756.18
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.02
Fe3.20
SiO210.10
Al2O34.38
P0.137
Size 0-10MM1.19
Size 10-20MM1.68
Size 20-100MM56.75
Size +100MM40.38
MOISTURE0.95