Supply Date07 Sep 2022
Contract NumberSAFAL/P/MN ORE/09.01/2022
ItemManganese Ore
Supplier NameKAMIZHI LUNETA - MN ORE
Grade (%)High (44% - 50%)
Lot NumberKAMIZHI LUNETA - MN ORE
Deviance0
Inward Quantity34.18
Freight550
Loading Charges0
Offloading Charges0
Royalty131.13
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost4679.1
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.15
Fe2.92
SiO28.24
Al2O32.90
P0.128
Size 0-10MM2.02
Size 10-20MM1.55
Size 20-100MM55.73
Size +100MM40.70
MOISTURE1.45