Supply Date06 Sep 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity32.64
Freight450
Loading Charges126
Offloading Charges0
Royalty131.61
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost5132.23
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.24
Fe318
SiO28.74
Al2O34.77
P0.168
Size 0-10MM2.48
Size 10-20MM4.10
Size 20-100MM53.07
Size +100MM40.35
MOISTURE1.35