Supply Date03 Sep 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity41.78
Freight450
Loading Charges286.5
Offloading Charges0
Royalty125.03
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost6970.05
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.01
Fe2.71
SiO29.24
Al2O33.18
P0.112
Size 0-10MM2.24
Size 10-20MM1.90
Size 20-100MM59.74
Size +100MM36.12
MOISTURE0.85