Supply Date02 Sep 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity43.08
Freight450
Loading Charges34.5
Offloading Charges0
Royalty51.05
Other Cost16.05
Quality Deviance0
Grade Deviance0
Total Cost6311.96
Conversion Rate (Please insert 1 if no conversion is required)16.05
Inward StatusAccepted

Raw Material Test

Showing 1-20 of 20 items.
Raw Material ComponentValue
Mn47.05
Fe3.35
SiO210.98
Al2O36.17
P0.139
Size 0-10MM1.45
Size 10-20MM1.20
Size 20-100MM65.01
Size +100MM32.34
MOISTURE1.02
Mn47.05
Fe3.35
SiO210.98
Al2O36.17
P0.139
Size 0-10MM1.45
Size 10-20MM1.20
Size 20-100MM65.01
Size +100MM32.34
MOISTURE1.02