Supply Date02 Sep 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity30.72
Freight41.15
Loading Charges1.758
Offloading Charges0
Royalty6.16
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4763.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.70
Fe4.95
SiO214.82
Al2O35.70
P0.137
Size 0-10MM2.60
Size 10-20MM2.95
Size 20-100MM73.90
Size +100MM20.55
MOISTURE1.52