Supply Date30 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity42
Freight27.72
Loading Charges1.237
Offloading Charges-24.99690476
Royalty6.85
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6796.02
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.15
Fe4.10
SiO222.20
Al2O32.39
P0.130
Size 0-10MM2.10
Size 10-20MM1.5
Size 20-100MM8.79
Size +100MM87.61
MOISTURE0.70