Supply Date30 Aug 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity34.08
Freight460
Loading Charges0.073357864
Offloading Charges92.55
Royalty114.28736
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost3795.83
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.80
Fe2.35
SiO217.20
Al2O34.01
P0.121
Size 0-10MM2.4
Size 10-20MM2.10
Size 20-100MM75.30
Size +100MM20.20
MOISTURE1.15