Supply Date29 Aug 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity51.1
Freight450
Loading Charges310.42
Offloading Charges0
Royalty137.83
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost8544.42
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.10
Fe2.20
SiO210.50
Al2O33.90
P0.121
Size 0-10MM2.20
Size 10-20MM1.50
Size 20-100MM70.40
Size +100MM25.90
MOISTURE0.50