Supply Date29 Aug 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity31.14
Freight111.06
Loading Charges0
Offloading Charges0
Royalty105.36
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost3899.03
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.05
Fe3.10
SiO219.50
Al2O35.73
P0.112
Size 0-10MM3.10
Size 10-20MM2.20
Size 20-100MM65.10
Size +100MM29.60
MOISTURE0.95