Supply Date29 Aug 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity27.78
Freight350
Loading Charges-750
Offloading Charges0
Royalty87.66
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost2402.38
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.35
Fe3.50
SiO217.60
Al2O35.15
P0.167
Size 0-10MM2.10
Size 10-20MM2.40
Size 20-100MM95.50
Size +100MM0
MOISTURE1.01