Supply Date28 Aug 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity38.26
Freight460
Loading Charges29.29333225
Offloading Charges92.55
Royalty109.41716
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost4318.79
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.87
Fe2.35
SiO216.10
Al2O33.36
P0.135
Size 0-10MM1.10
Size 10-20MM2.22
Size 20-100MM60.90
Size +100MM35.78
MOISTURE1.10