Supply Date27 Aug 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity34.48
Freight30.8
Loading Charges2.722
Offloading Charges10
Royalty6.23
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5370.33
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.2
Fe3.5
SiO216.6
Al2O35.01
P0.125
Size 0-10MM3.1
Size 10-20MM2.9
Size 20-100MM60.6
Size +100MM36.5
MOISTURE1.01