Supply Date30 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity43.4
Freight27.72
Loading Charges1.237
Offloading Charges-24.99700461
Royalty7.97
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7071.16
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.60
Fe4.10
SiO210.50
Al2O34.31
P0.121
Size 0-10MM1.50
Size 10-20MM2.60
Size 20-100MM65.55
Size +100MM30.95
MOISTURE0.75