Supply Date26 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity46.4
Freight26.47
Loading Charges1.237
Offloading Charges-24.99698276
Royalty7.42
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7476.43
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.01
Fe5.12
SiO217.10
Al2O33.20
P0.128
Size 0-10MM3.70
Size 10-20MM3.15
Size 20-100MM45.20
Size +100MM47.95
MOISTURE0.69