Supply Date26 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity37.7
Freight38
Loading Charges1.234
Offloading Charges-25.49840849
Royalty7.42
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6490.27
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.24
Fe2.85
SiO212.16
Al2O34.27
P0.115
Size 0-10MM1.55
Size 10-20MM2.38
Size 20-100MM85.87
Size +100MM10.20
MOISTURE0.75