Supply Date26 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity26.54
Freight29.237
Loading Charges1.237
Offloading Charges-26.23398644
Royalty7.42
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4317
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn44.26
Fe3.10
SiO216.58
Al2O34.05
P0.122
Size 0-10MM3.10
Size 10-20MM1.60
Size 20-100MM26.53
Size +100MM68.77
MOISTURE0.70