Supply Date26 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity44.76
Freight29.726
Loading Charges1.237
Offloading Charges-25.00290438
Royalty7.42
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7357.65
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.68
Fe2.75
SiO21924
Al2O34.28
P0.117
Size 0-10MM2.68
Size 10-20MM2.05
Size 20-100MM15.67
Size +100MM79.60
MOISTURE1.25