Supply Date26 Aug 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity45.06
Freight450
Loading Charges310.42
Offloading Charges0
Royalty139.29
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost7538.53
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.35
Fe3.25
SiO29.35
Al2O33.85
P0.127
Size 0-10MM2.16
Size 10-20MM2.50
Size 20-100MM59.11
Size +100MM36.23
MOISTURE0.85